Because of the damage brought about by Typhoon ODETTE, NORECO II operates on two principles:
1. SAFETY – safety of our line workers and safety of our member-consumer-owners
2. RESTORATION OF POWER AT THE FASTEST TIME – restoration of power will be prioritized in the following manner:
First priority – backbone lines
Second priority – lateral lines
Third priority – secondary lines
Last priority – residence without power
PLEASE CONSIDER ALL THE LINES ALWAYS ENERGIZED
Please report any problem to our NORECO II Office