Interested companies willing to join the bidding for the delivery, installation and commissioning of one (1) set Pyrolysis Gasification Process with Environment Pollution Control Devices to turn solid wastes into useful byproducts are invited to attend the pre-bid conference slated on October 20 at the General Services Office.
Mayor Felipe Antonio Remollo said that if installed and operational the city’s solid wastes will now be processed and converted into bricks, hollow blocks and other solid materials that can be used for the various infrastructure projects and in the maintenance of roads.
The City Council recently approved P 22 million to fund the project as a means to address the concern for sustainable solid waste management.
Mayor Remollo said that the pyrolysis machine along with other equipment will be housed in the newly-completed Central Materials Recovery Facility inside the Eco-Park will guarantee that the old dumpsite will be closed for good.
Among the equipment included in project of commissioning the proposed pyrolysis gasification process are environmental pollution control devices; food waste pulverizer; plastic densifier melting machine with EPCD; mortar mixer; hollow block machine; non-biodegradable shredder; municipal waste shredder and rotary composter and heavy duty biodegradable shredder.