CIVIL WORKS continue for the installation and extension of box culverts that will improve the drainage canal system from the public market to the Rizal Boulevard and lessen incidents of flood in the area.

Mayor Felipe Antonio Remollo has directed the City Engineer’s Office to proceed with the construction of the parking area at the Dumaguete Press Club and shoreline protection to ensure the coastal barangays are resilient from storm surges.